Battery Energy Storage Systems (BESS): SCADA Integration, Container HVAC & G99 Grid Synchronisation
Engineered for UK renewable energy developers, EPC contractors, and DNO network operators. MASK Control Systems Ltd delivers turnkey utility-scale BESS master control panels, G99/G100 grid compliance, closed-loop container liquid cooling HVAC automation, NFPA 855 fire suppression interlocks, and multi-protocol DNP3/IEC 61850 substation SCADA gateways.

Custom BESS master control panels engineered in Cullompton, Devon.
Ensuring Grid Stability & Thermal Safety for UK Energy Storage
The rapid rollout of utility-scale battery energy storage systems (BESS) across the UK is critical for stabilizing a grid saturated with intermittent wind and solar generation. However, connecting multi-megawatt lithium-ion storage assets to 11kV, 33kV, or 132kV distribution networks presents extreme engineering challenges: strict ENA Engineering Recommendation G99 disconnection compliance, real-time frequency response within 500 milliseconds, and catastrophic thermal runaway prevention under NFPA 855 directives.
Headquartered in Cullompton, Devon, MASK Control Systems Ltd delivers comprehensive automation and electrical engineering for stationary energy storage. We design and manufacture bespoke BESS master plant controllers, G99 protection switchboards, liquid cooling chiller automation panels, emergency power-off (EPO) safety loops, and cyber-secure DNP3 / IEC 61850 SCADA outstations for sites across the United Kingdom.
Specialized Control & SCADA Engineering for Utility BESS Sites
From battery container thermal regulation to grid export limitation, our systems engineers deliver deterministic, sub-second automation:
ENA G99 & G100 Grid Protection Panels
Certified loss-of-mains protection relays continuously monitoring RoCoF (Rate of Change of Frequency), vector shift, and voltage stages. Integrates G100 fail-safe power transducers that throttle inverter export within 5 seconds to prevent grid overload.
Container Liquid Cooling & HVAC Loops
Precision thermal management for liquid-cooled cold plates and DX air handling units. Features modulating inverter-driven chiller compressors, glycol loop pump sequencing, and ambient economizer damper modulation maintaining cells between 20°C and 25°C.
NFPA 855 Fire & Gas EPO Interlocks
Multi-stage safety architecture integrating early-warning off-gas sensors (H2, CO, VOCs), clean-agent Novec 1230 discharge monitors, explosion relief dampers, and fail-safe Emergency Power Off (EPO) signals tripping HV vacuum circuit breakers.
BMS Telemetry & Inverter Integration
Multi-protocol polling of battery management system (BMS) strings and power conversion system (PCS) inverters over Modbus TCP, CANopen, and Ethernet. Aggregates rack voltages, cell thermistors, state of charge (SOC), and state of health (SOH).
DNP3 & IEC 61850 DNO SCADA Outstations
Secure RTU communications connecting the BESS plant directly to regional DNO control rooms (National Grid, UKPN, SSEN, SPEN). Supports DNP3 Outstation with secure authentication and IEC 60870-5-104 telemetry for real-time dispatch.
Sub-Millisecond Fault Sequence Recording
GPS-synchronized IEEE 1588 PTP or IRIG-B time-stamping capturing sub-millisecond digital events during grid transient faults. Enables definitive post-mortem root-cause analysis for insurance and National Grid compliance sign-offs.
Form 4b Switchboards, G99 Protection & Defra Environmental Safety
Utility-scale BESS sites combine high-voltage AC grid connections with high-current DC battery strings capable of delivering severe prospective short-circuit fault currents (exceeding 50kA).
MASK Control Systems designs auxiliary switchgear and control enclosures engineered for the harshest utility environments:
- BS EN 61439-2 Form 4b Enclosures: Total physical compartmentalisation separating main copper busbars from outgoing feeder terminals, allowing safe maintenance without de-energizing adjacent battery strings.
- Short-Circuit Withstand Validation: All switchboards, busbar droppers, and protection relays are calculated and sized to withstand peak prospective fault currents to BS EN 61439-1.
- Dual-Redundant 110V DC UPS Battery Tripping: Fail-safe DC control power distribution ensuring that protection relays and motorized breaker trip coils remain active even during total AC blackout.
BESS Regulatory & Grid Code Matrix
Mandatory loss-of-mains RoCoF protection and frequency response for UK grid connections.
Fail-safe power monitoring schemes preventing battery discharge from exceeding DNO export agreements.
Stationary battery energy storage installation, thermal runaway containment, and gas detection standards.
Standardized electrical substation communication protocols for automated remote dispatch.
PLC Hardware, Cloud SCADA & Cyber-Secure Edge Gateways
We engineer scalable automation architectures built for the 20-year operational lifecycle of UK utility storage assets:
Siemens S7-1500 & SIPROTEC
Substation TierRedundant S7-1500R/H hot-standby CPUs paired with SIPROTEC numerical protection relays. Executes sub-500ms dynamic frequency response (DFR), active power ramps, and PROFINET communications to container I/O islands.
Rockwell ControlLogix 5580
Modular GatewayHigh-throughput chassis architecture with dedicated ProSoft DNP3 and Modbus TCP communication co-processors. Interfaces with multiple battery inverter skids and auxiliary power distribution switchgear.
Ignition SCADA & Cloud
Real-Time TelemetryComprehensive HMI/SCADA platform delivering real-time single-line diagram (SLD) visualization, thermal heat maps across battery racks, revenue settlement logs, and automated alarm notification dispatch.
Frequently Asked Questions: BESS Automation
Key questions asked by UK renewable energy developers, EPC contractors, and DNO engineers:
How does MASK Control Systems ensure ENA Engineering Recommendation G99 compliance for BESS assets?
What thermal management and HVAC controls are required for containerised battery storage?
How are fire suppression systems and emergency power-off (EPO) interlocked in BESS containers?
Which protocols are used to bridge battery management systems (BMS), inverters, and DNO SCADA?
Can MASK Control Systems implement G100 export and import limitation schemes?
Engineer G99 Grid Compliance & SCADA Reliability for Your BESS
Discuss your utility-scale battery energy storage project, G99/G100 protection panel requirements, container liquid chiller automation, or DNO SCADA gateway with our senior control engineers. We deliver bespoke electrical designs, proven PLC software, and seamless on-site commissioning across the UK.